The engineering, production and assembly of the four pools was entrusted to Preformati Italia, italian leader in the production of self-supporting structures in EPS(Expanded Sintered Polystyrene).
Condino’s aquaclub is the example of how the multifunctional system of the new millennium is differentiated from the traditional one, characterized by a growing diffusion of free shapes, for the integration of unpublished appliances, from point elements (specific speakers and underwater lights). All typical features that EPS structures are able to guarantee at the same time with an unique execution speed, efficiency and energy savings to ensure the containment of operating costs.
CURIOSITIES ABOUT THE POOLS
Total sq m of EPS used | 407,41 mc |
Total terminals (nozzles, lights, hydromassage on beds etc.) inserted : | 181 pcs |
Structures realization time: | 1,440 hours |
Pool assembly time: | 2,185 hours |
Total sq m waterproofing: | 860 sq m |
Pools total capacity: | 590,000 L. |
N° of pumps and blowers: | 24 |
N° of tiles layed: | 12.900 |