The project is composed by 4 pools: a semi-Olympic pool and two recreational pools that represent the sports offer of the center. The fourth hot tub with free shape adds a touch of well-being and relaxation to the background. The Klimapool construction method mixes the use of polymeric material with an armed supporting structure completely integrated into the pool and therefore invisible from the outside. This allowed to build the hot tub without the aid of external containment walls and to maintain its “aesthetic lightness”.
LocationBorgo Valsugana (Trento)Type of workSelf-supporting recreational poolMeasures11,13 x 7,6 x h.1,55 mFinal coveringMosaicPartnerStudio Tesi Engineering srlShare