The renovation of the swimming pool for the apartment complex “Villa Italia” located in Arco (TN) is a perfect example of the use of EPS (Expanded Polystyrene Sintered) and the “Pool in Pool” technology to transform, in just 20 days, an old pool into a modern one.
A renovated swimming pool equipped with optional as hydromassage stations, relaxation beds and a platform to create two levels of water that make the use of the pool less monotonous also facilitating the use by guests.
The existing pool has been insulated to improve the structure from the point of view of energy saving. The timing imposed by the needs of the client required that the pool construction and its testing were taking place in record time in order to be ready to welcome the guests of the apartments for the 2015 summer season.